http://www.northsails.dk/
Link to a good video in packing a spinnaker.
https://www.youtube.com/watch?v=XttiLcYPBQI
![]() |
| Packed in the bag. |
![]() |
| Cloosed bag. |
![]() |
| Packed in the bag. |
![]() |
| Cloosed bag. |
![]() |
| port side early spring. |
![]() |
| Sunshine at the docks. |
![]() |
| The harbor in spring. |
![]() |
| The new engine break from the inside of the cabinet. |
![]() |
| View from inside the engine room. On the left Volvo Penta D1-30. |
![]() |
| The old navstation. Notice the old log and wind inst. |
| The hole panel has been taken out. |
| The new navstation. including: 9 swich - panel, FMradio, VHF radio, inst. display, GPS, 220v socket, lighter socket and new USB power socket. |
| Notice the "cut out" and all the inst. placed in the new cabinet door. |
| Tried to clean up as much cable as possoble. |
| 220v socket, lighter socket and new USB power socket. |
![]() |
| Speakers before cleaning. |
![]() |
| Cleaned and ready for new foam. |
![]() |
| the middel/ woffer needed new foam around the cone. Bought them throuhgt a german site: audio-parts.de |
![]() |
| SB side ready. |
![]() |
| BB side ready |